Brisbane’s Top 10 Major Infrastructure Projects, 2026 to 2035

Tim Allen

By Buyer’s Agent and Director, IPS Buyer’s Agents

IPS Buyer’s Agents graphic: Brisbane major infrastructure projects to 2035

The biggest infrastructure projects in Brisbane between now and 2035 are Cross River Rail (a new rail line and four underground stations under the CBD, with services due in 2029), the Brisbane 2032 stadium and National Aquatic Centre at Victoria Park, a new $1.4 billion arena and up to 4,000 homes at the Gabba, the athletes’ village at the Brisbane Showgrounds, about 465 new hospital beds at the PA, QEII and Prince Charles hospitals, a $5 billion upgrade of Brisbane Airport and the $1.95 billion Gateway to Bruce upgrade.

These projects decide where jobs, transport and new homes will be across Brisbane over the next decade. Below are the ten that matter most for buyers: what each one is, what it costs, when it is due, where it stands in November 2026 and what it means if you are buying.

Key takeaways

  • Cross River Rail, the city’s biggest project at $19.041 billion, is moving into testing, with first passenger services expected in 2029.
  • Main construction of the Brisbane 2032 stadium and National Aquatic Centre at Victoria Park starts in 2027, and a new $1.4 billion Gabba arena is due by 2031, with almost 4,000 homes on the Gabba site after the Games.
  • The athletes’ village at the Brisbane Showgrounds becomes about 1,800 homes after 2032, and Northshore Hamilton has land for up to 10,000.
  • About 465 new hospital beds are coming at the PA, QEII and Prince Charles hospitals between 2027 and 2031.
  • The Brisbane Metro expansion, the Toowong to West End bridge and the Story Bridge renewal are not yet funded, so don’t pay extra for them.

Published 26 November 2026. This guide covers the Brisbane City Council area. For the northside in more detail, see our North Brisbane infrastructure guide. Costs, dates and status come from the government, council and project pages linked under each project, checked on 21 November 2026. It is general information only, not financial or planning advice, so check a property’s zoning, flood risk and approvals with council and your conveyancer before you buy.

Brisbane’s top 10 projects at a glance

ProjectCostStatus, November 2026
1. Cross River Rail$19.041 billionTesting and commissioning; services from 2029
2. Brisbane Stadium and National Aquatic Centre, Victoria ParkPart of the $7.1 billion Games venues programEarly works; construction from 2027
3. Gabba arena and housing precinct$1.4 billion arenaConsortium chosen; arena open by 2031
4. Athletes’ village at the Brisbane Showgrounds, and Northshore homes$287.5 million Showgrounds worksWorks under way; about 1,800 homes after 2032
5. PA, QEII and Prince Charles hospitals$800 million for the PA aloneNew beds from 2027 to 2031
6. Brisbane Metro expansionNot yet costedBusiness case due late 2027
7. Brisbane Airport upgradesAbout $5 billion programMaster plan approved June 2026
8. Gateway to Bruce upgrade$1.95 billionEarly works under way
9. Olympic venue upgrades in the suburbsPart of the $7.1 billion Games venues programPlanning
10. Council roads, bridges and renewal$110 million road resurfacing in 2026–27Under way

1. Cross River Rail

Cross River Rail is a 10.2 km rail line from Dutton Park to Bowen Hills, with 5.9 km of twin tunnels under the Brisbane River and the CBD. It removes the city’s biggest rail bottleneck, the single river crossing.

  • What is being built: four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street, a new Exhibition station at Bowen Hills, seven rebuilt southside stations from Dutton Park to Salisbury, and three new Gold Coast line stations.
  • Cost: the Queensland Government put the final price at $19.041 billion in October 2025.
  • Status: major civil construction is nearly finished and the project is moving into testing and commissioning, with more than 10,000 tests to complete. First passenger services are expected in 2029.

For buyers: suburbs on the southside line, such as Yeronga, Moorooka and Salisbury, and the station precincts at Woolloongabba and Boggo Road gain faster, more frequent trains into the CBD. Homes within walking distance of an upgraded station are the ones to watch.

Official page: Cross River Rail Delivery Authority, project overview